
Additional Specs, Equipment and Information:Engines Engine 1: Engine/Fuel Type: Diesel |
|
General
General BUILDER: Rossi Navi DELIVERY: three year from signature contract LOA: 65 m BEAM: 12 m DRAFT: 2,8 m CLASSIFICATION: RINA “X Hull Mach YCh – Green Plus” GROOS TONNAGE: 900 Tons DESIGNER: Tommaso Spadolini Design NAVAL ARCHITECTS : Arrabito
Capacities FUEL TANKS 80.000 lt EXTRA FUEL 60.000 lt FRESH WATER 25.000 lt SEWAGE WATER 12.000 lt BALLAST WATER 30.000 lt MAX SPEED : 20 / 22 kts CRUISING SPEED: 17 / 19 kts RANGE @ CRUISING SPEED (with extra fuel): 1.600 n.m. RANGE @ 12 KTS (with extra fuel): 2.500 n.m.
ENGINES: 2 x 3.440 KW ( 2 x 4615 BHP) or 2 x 4.300 KW ( 2 x 5776 BHP)
ENGINE MODEL: MTU 16 V 4000 93 L or MTU 20 V 4000 M 93 L Generators GENERATORS: n.3 250 KVA - 400 V at 50 HZ Caterpillar mod. C.9 with set for automatic parallel operation n.1 103 KVA 400 V at 50 HZ Caterpillar mod. C4.4 for emergency
Electricity SHORE POWER: 400 V at 50 HZ three phase 200 V at 50 HZ for guests accommodation 24 V DC for navigation users and emergency lighting
Other machinery : Air Conditioning: Frigomar or Condaria Bow Thruster: NAIAD MARINE VT 100 Stabilizer: NAIAD MARINE Desalinator: Tecnicomar BICOMPACT 4000 600 lt/h Boiler: n.4 Gianneschi of 400 lt – 7,5 Kw Fuel oil purifier: ALFA LAVAL MMB 304 - 1.400 lt/h
Every item, even whenever described more than one time in this specification, to be supplied only once. The following materials are excluded from the scope of supply of the Builder: All the esthetical and interiors general and detail design; All the “domotics” gear (LUTRON and similar) due to manage lights, awnings, etc. Paintings, sculptures and, generally, any art masterpiece; Navigation charts, pilot books and similar (both traditional and electronic types); Binoculars, rulers and wheelhouse minute navigation aids; Consumption materials of any kind, excluding the fuel and lube-oil strictly necessary for the sea trials.
The Builder will take care of duly fitting on board of all the Users supplies under the condition that, due to their dimensions, weight and/or location, do not harm the vessel characteristics and/or performance.
ALLOWANCES Both the Buyer and the Builder assigned provisional costs or allowance to certain items required in the construction of the Vessel. The matter will be dealt by the Parties as per provisions of the Contract. The Builder's cost to install each item is not included in the Price and makes part of the provisional or allowance cost indicated below. The Builder will take care of duly fitting on board the budgeted items whose relevant agreed costs are the following:
|
|
|
Contact Fraser Yachts.
2 Quai Antoine 1er
Monaco 98000
Tel +377 93 100 450
Fax +377 93 100 451
Email us
2007
Amels
Ocean Going Displacement
2014
Raffles Yachts
Ocean going
2001
Feadship
Displacement Van Lent
2014
Rossinavi
55 m Displacement
2014
Rossinavi
55 m Semidisplacement
2013
Holland Jachtbouw
Hybrid Twin Screw Project